Panel and Subpanel Work in Bedford-Stuyvesant

Safe, Code-Compliant Power for Your Historic Home

Modern electrical capacity that respects your brownstone’s character while keeping your family safe and your systems running smoothly.
An electrical distribution panel with circuit breakers, wiring, and terminal blocks, neatly organized inside a gray metal enclosure. The panel includes labels and various colored wires connected to the components.

Hear from Our Customers

A person uses a red cordless drill to work on an open electrical panel with various wires and circuit breakers inside.

Electrical Panel Upgrades Bedford-Stuyvesant

More Power, Less Worry, Zero Compromises

Your lights stay on when you need them. Your circuit breakers stop tripping every time you run the dishwasher and microwave together. You can actually use your air conditioner without worrying about overloading your system.

That’s what happens when your electrical panel can handle what you’re asking of it. No more rationing power between rooms or unplugging one thing to use another.

Your home works the way it should. Reliably. Safely. Without the constant reminder that your electrical system is decades behind your actual needs.

Licensed Electrical Contractors Bedford-Stuyvesant

Brooklyn Electricians Who Get Historic Homes

We’ve been working in Bedford-Stuyvesant’s historic brownstones for years. We know these buildings inside and out—from the original knob-and-tube wiring installed in the 1890s to the unique challenges of upgrading electrical systems without damaging irreplaceable architectural details.

Our licensed and insured team understands that your home isn’t just another job site. It’s a piece of Brooklyn history that happens to need modern electrical capacity. We treat it that way.

Every installation meets current NYC electrical codes while respecting the character that makes Bed-Stuy special. No shortcuts, no surprises, no damage to original features you can’t replace.

Three industrial server cabinets are shown; the cabinet on the left has its door open, revealing electrical components and wiring inside, while the other two cabinets are closed.

Panel Installation Process Bedford-Stuyvesant

Straightforward Process, Professional Results

First, we evaluate your current system and calculate your actual power needs. Not what you think you need—what your home actually requires based on your appliances, lighting, and future plans.

Next, we design the installation to work with your specific space and architectural constraints. Historic brownstones don’t have standard layouts, so cookie-cutter approaches don’t work.

Then comes the installation itself. We pull permits, coordinate with the city, and handle all the technical work while keeping disruption to your daily routine minimal. The power stays on during most of the process.

Finally, we test everything, walk you through the new system, and make sure you understand how it works. You get documentation for your records and peace of mind that everything was done right.

A man wearing a white hard hat and a gray shirt operates a control panel in an industrial factory, surrounded by machinery and colorful cables.

Ready to get started?

Explore Our Gallery

About Electrified

Get a Free Consultation

Subpanel Installation Bedford-Stuyvesant

What You Get with Professional Panel Work

Your installation includes everything needed for safe, code-compliant operation. New circuit breakers sized for your specific loads. Proper grounding and bonding that meets NYC requirements. GFCI protection where required by code.

In Bedford-Stuyvesant’s older homes, this often means working around original structural elements while ensuring modern safety standards. Many brownstones built before 1900 have unique electrical routing challenges that require experienced judgment, not just technical knowledge.

The work also includes proper labeling of all circuits, so you know exactly what controls what. No more guessing which breaker controls the kitchen outlets or basement lighting.

All installations come with permits pulled through the proper channels and inspections scheduled to ensure everything meets city requirements. You get documentation that protects your investment and satisfies insurance requirements.

A person wearing a white hard hat, checked shirt, and overalls is working with an open electrical panel on a wall, adjusting switches or circuit breakers. Wires and construction materials are visible around them.

How much does panel and subpanel installation cost in Bedford-Stuyvesant?

Panel upgrade costs in Bedford-Stuyvesant typically range from $2,500 to $5,000 for a full main panel replacement, while subpanel installations usually run $800 to $2,200. The final price depends on your home’s specific requirements, the panel size needed, and how much additional wiring is required.

Historic brownstones often need extra work to route new wiring through original construction, which can affect pricing. Many homes also need service upgrades from the utility company, adding to the total investment.

The good news is that panel upgrades often qualify for insurance discounts and significantly increase property value. Most homeowners find the improved safety and reliability worth every penny, especially when they can finally use their appliances without worrying about tripped breakers.

Yes, all panel and subpanel installations in Brooklyn require permits from the Department of Buildings. This isn’t optional—it’s required by law, and skipping permits can create serious problems when you sell your home or file insurance claims.

The permit process ensures your work meets current electrical codes and safety standards. It also requires inspections at key stages of the installation, which protects you from substandard work or dangerous shortcuts.

We handle permit applications and coordinate inspections as part of our service. We know exactly what documentation is required and how to navigate the city’s approval process efficiently. Trying to get permits yourself usually takes longer and creates unnecessary complications.

Often, yes. If your main panel doesn’t have enough circuits for your needs, a subpanel can add capacity without requiring a complete main panel replacement. This is especially common in Bedford-Stuyvesant homes where kitchens have been renovated or basement spaces converted to living areas.

Subpanels work by taking power from your main panel and distributing it to specific areas of your home. This allows you to add dedicated circuits for high-draw appliances like air conditioners, electric ranges, or workshop equipment without overloading existing circuits.

However, if your main panel itself is undersized or outdated, a subpanel won’t solve the underlying problem. We can determine whether your tripping issues are caused by insufficient circuits or inadequate main panel capacity, then recommend the most cost-effective solution.

Most panel installations in Bedford-Stuyvesant brownstones take 6 to 10 hours of work spread over one or two days. The timeline depends on your home’s specific layout, the complexity of the installation, and whether additional wiring needs to be run.

Historic homes often present unique challenges that can extend the timeline. Original plaster walls, unusual room layouts, and existing wiring that doesn’t follow modern routing patterns all require careful navigation. We plan for these factors and communicate realistic timelines upfront.

The actual power outage during installation is usually limited to a few hours. Most of the preparation work—running new wiring, mounting panels, and organizing circuits—happens with your power still on. The final connections and testing require a temporary shutdown, but we minimize this disruption.

A main panel upgrade replaces your entire electrical service entrance, increasing your home’s total electrical capacity. This is necessary when your current service can’t handle your power demands, typically when you’re adding major appliances, electric vehicle charging, or converting to electric heating.

A subpanel adds circuits and distributes existing power more effectively without increasing total capacity. It’s like adding more outlets to your home without upgrading your internet speed—you can plug in more devices, but you’re still working with the same total bandwidth.

For most Bedford-Stuyvesant homeowners, the decision comes down to whether you need more total power or just better distribution of what you already have. If your main panel has spare capacity but not enough circuit spaces, a subpanel is usually the more economical choice.

Not when done by electricians experienced with historic properties. We preserve original architectural elements while routing new wiring through existing pathways or concealed areas that don’t affect the home’s character.

Most panel work in Bedford-Stuyvesant brownstones involves strategic placement that respects the original design. Panels are typically located in basements, utility areas, or discrete locations that don’t interfere with period details like original moldings, hardwood floors, or decorative plasterwork.

We know how to work around original construction materials and techniques. We understand which walls can be opened safely, how to navigate around original timber framing, and where modern electrical components can be installed without compromising structural or aesthetic integrity.