Panel and Subpanel Work in East New York

Stop Dangerous Breaker Trips for Good

Your family deserves reliable power that doesn’t fail when you need it most, especially during East New York’s extreme heat waves.
An electrical distribution panel with circuit breakers, wiring, and terminal blocks, neatly organized inside a gray metal enclosure. The panel includes labels and various colored wires connected to the components.

Hear from Our Customers

A person uses a red cordless drill to work on an open electrical panel with various wires and circuit breakers inside.

Electrical Panel Upgrades East New York

Finally Handle Modern Electrical Demands

You’re tired of breakers tripping every time you run the microwave and AC together. Your lights dim when appliances kick on, and you’re constantly resetting the same circuits.

That ends with proper panel and subpanel work. You get dedicated power where you need it most—your kitchen, workshop, or home office—without overloading your main system. No more choosing between comfort and safety.

East New York’s older buildings weren’t designed for today’s electrical demands. A well-installed subpanel gives you the capacity to power everything from EV chargers to high-efficiency HVAC systems without the constant worry of electrical fires or power failures.

Licensed Electricians East New York

Brooklyn Electrical Code Experts

Electrified has been serving East New York residents and businesses as a trusted electrical contractor. We understand the unique challenges of Brooklyn’s older buildings and newer developments, from pre-war construction to modern housing projects.

Every technician is licensed, insured, and trained on NYC’s electrical standards. We know which buildings need specific upgrades, where code requires GFCI protection, and how to properly handle the aluminum wiring common in East New York’s older homes.

When Con Edison has issues or your building’s aging electrical system starts acting up, East New York calls Electrified. We don’t cut corners because electrical work isn’t the place to take shortcuts.

Three industrial server cabinets are shown; the cabinet on the left has its door open, revealing electrical components and wiring inside, while the other two cabinets are closed.

Panel Installation Process East New York

Transparent Process, No Surprises

First, we assess your current electrical system and calculate your actual power needs. No guesswork—we use proper testing equipment to determine exactly what your home requires for safe, reliable operation.

Next comes permit filing and scheduling. We handle all NYC permit requirements and coordinate with Con Edison when necessary. The installation typically takes 4-8 hours depending on complexity, with some planned power interruptions.

During installation, we remove the old components, install your new panel or subpanel with proper grounding, and connect all circuits according to current electrical code. Everything gets inspected and tested before we consider the job complete. You get a system that’s built to handle East New York’s electrical demands safely.

A man wearing a white hard hat and a gray shirt operates a control panel in an industrial factory, surrounded by machinery and colorful cables.

Ready to get started?

Explore Our Gallery

About Electrified

Get a Free Consultation

Subpanel Services East New York Brooklyn

Complete Panel and Subpanel Solutions

Panel and subpanel work includes everything from 60-amp additions for workshops to 200-amp main panel upgrades for whole-house electrical capacity. We install dedicated circuits for high-demand appliances, EV charging stations, and HVAC systems.

East New York’s housing mix—from historic brownstones to modern developments—requires different approaches. We handle aluminum wire replacement, fuse box conversions, and GFCI installations required by current code. Each project includes proper grounding, circuit labeling, and safety testing.

For East New York residents dealing with frequent power issues during summer heat waves, strategic subpanel placement can distribute electrical load more effectively. This prevents the voltage drops that affect the neighborhood during peak demand periods, keeping your power stable when others are struggling.

A person wearing a white hard hat, checked shirt, and overalls is working with an open electrical panel on a wall, adjusting switches or circuit breakers. Wires and construction materials are visible around them.

How much does panel and subpanel work cost in East New York?

Subpanel installation in East New York typically ranges from $1,200 to $2,500, depending on the amperage and location. A 100-amp subpanel for a garage or workshop costs less than a 200-amp main panel upgrade.

The final cost depends on several factors: distance from your main panel, number of circuits needed, and whether existing wiring needs replacement. Many East New York homes still have aluminum wiring that should be updated for safety.

We provide upfront pricing before starting work, including permits and inspections. No surprise charges or “while we’re here” upsells—just honest electrical work that solves your power problems permanently.

Frequent breaker trips in East New York homes usually mean your electrical system is overloaded. Many buildings in the area still have 60-amp or 100-amp panels that can’t safely handle modern electrical demands.

When you’re running AC, kitchen appliances, and electronics simultaneously, you’re drawing more power than these older systems can provide. The breakers trip to prevent overheating and potential fires—they’re actually protecting you.

A subpanel installation can solve this by creating dedicated circuits for high-demand areas like kitchens or home offices. This distributes the electrical load more effectively, eliminating the constant trips while keeping your family safe.

Yes, all panel and subpanel work in East New York requires NYC electrical permits and inspections. This isn’t optional—it’s required by law and necessary for your safety and insurance coverage.

We handle all permit applications and coordinate inspections with the city. The permit process typically takes a few days, and we won’t start work until everything is properly approved.

Working without permits can result in fines, insurance issues, and problems when selling your home. Licensed electricians know exactly which permits are needed and ensure all work meets current NYC electrical code requirements.

Most EV chargers require a dedicated 240-volt circuit, which is perfect for subpanel installation. A properly sized subpanel can easily handle Level 2 EV charging while maintaining power for other garage or driveway needs.

The key is calculating your total electrical load correctly. If your main panel is already near capacity, adding an EV charger could overload the system. A subpanel provides the dedicated power your charger needs without affecting the rest of your home.

We assess your current electrical setup and recommend the right amperage subpanel for your EV charging needs. This ensures safe, reliable charging without the risk of overloading your main electrical system.

Most subpanel installations in East New York take 4-8 hours, depending on the complexity and distance from your main panel. Simple garage subpanels are faster than basement installations requiring extensive wiring.

Main panel upgrades typically take 6-12 hours and may require multiple days if significant rewiring is needed. We schedule work to minimize disruption and always communicate timing expectations upfront.

During installation, you’ll have planned power outages while we make connections. We coordinate these interruptions to work around your schedule and restore power as quickly as safely possible.

Panel repair involves fixing specific components like replacing individual breakers, tightening connections, or updating a few circuits. This works when your panel is relatively modern and the overall system is sound.

Panel replacement means installing a completely new electrical panel, usually because the existing one is outdated, damaged, or can’t handle your electrical needs. Most East New York homes with panels over 25 years old benefit more from replacement.

We evaluate your specific situation and recommend the most cost-effective solution. Sometimes a strategic subpanel addition is more practical than replacing your entire main panel, especially in older East New York buildings with challenging electrical access.